|
|
|
 |
Gwinnett Braves - Minor League Baseball Stadium
Lawrenceville, Georgia |
Barton Malow used Building Information Modeling (BIM) software to simulate the construction and operation of the stadium during the design phase prior to construction. By detecting coordination interferences and challenges early, Barton Malow was able to avoid costly changes during construction.
The Gwinnett Stadium design/build team and
stakeholders utilized the 3D model to connect design concepts
with the physical construction process, keeping
a fast-track project moving forward as needed.
Tekla Structures Steel Detailing BIM software was utilized during construction to
facilitate construction coordination with the various trades.

|
| |
|
 |
| |
|
|
|
|
|
|